Website content migration includes deciding what to retain, preparing it for the new site, transferring it and checking the result. Plan for that whole job before committing people to a migration deadline.
You can make the work easier to manage by taking one meaningful section through the process, finding out what it requires and using those results to plan the rest. Keep the content decisions, destinations and review work connected so people know what they are being asked to move and what will count as finished.
Start with a section and a destination that is ready
Plan an early trial with the delivery team. Choose a manageable subsection with its owner, including ordinary pages, a few variations and material where an error would matter. A complete service section with its instructions, contact details and linked documents will reveal relationships that a handful of disconnected pages can miss.
Use the inventory to establish what belongs in that section. Check the source lists and investigate missing items, including retained pages outside the navigation. Record the limits of the trial so its results can be interpreted properly.
You can examine proposed transformations before the new site is ready. Ask the team to show how source material would fit the planned structure and what questions remain. That rehearsal may expose a mistaken interpretation of the content.
The actual transfer needs a destination that can receive it. Agree with the developers when the relevant content fields, relationships and basic presentation will be ready in staging, the working site used for review before launch. You need to be able to examine the pages, files, links and navigation there. Some visual details can finish later.
Ask what is still changing and which changes would require another transfer or review. Fit the trial into the build sequence with time to act on its findings.
Carry content decisions into the migration record
Continue using your inventory, adding or linking the information needed for transfer. Keep the current URLs exact, identify the approved source version and show the intended destination. Include images, documents and important relationships alongside the page text.
Make the treatment clear. Content may be retained, revised, combined with other material, split into several pages or retired. Each choice needs enough detail for an implementer to act on it. Combining two pages requires a decision about what each contributes. Splitting one page requires agreement on where each part belongs.
Label proposed destinations and unresolved choices. Give each open question an owner, the evidence needed and a point at which the answer must be available. If you cannot find someone authorized to decide, bring that ownership gap to the manager or sponsor.
Walk through a few entries with the people doing the transfer. Ask them to explain which version they would use, where it would go and how they would check it. Their questions will show you where the instructions need work.
Keep transfer and editing under control
Agree on the words approved for transfer and the changes the migration process may make. Put copy corrections through the editorial review path. Otherwise, an owner comparing the old and new pages has to work out whether a difference is an approved revision or a transfer mistake.
The structure needs attention as well as the wording. Suppose an old page uses bold text both for subheadings and for warnings within paragraphs. A rule that turns all bold text into headings can retain every word while changing how the instructions read and appear in heading navigation.
Have the content, design and accessibility specialists agree on the treatment. When the meaning is unclear, ask the owner rather than letting the transfer process choose. Record the answer so similar material can be handled consistently.
If AI is part of the method, give it the same approved sources and limits. Have it document its transformations and flag uncertain cases. Use a separate inspection pass to compare the source and destination against the requirements before consulting the producer’s account. Direct checks and human review still matter because both automated passes can miss the same problem.
Test the work before estimating the rest
Ask the team to take the trial through transfer, correction and review. Find out which parts the method handles and which remain for people: formatting, images, files, metadata, tables and relationships may each need different attention.
Record the time spent setting up the method, running it, inspecting the result, repairing problems and checking again. Include any further tests and service costs. Compare the whole process with a realistic alternative, including the review either approach would need.
A fast transfer can leave a substantial repair queue. If a trial takes two hours to transfer and six hours to check and correct, all eight hours belong in the plan. Treat that as evidence about the tested batch; a more complicated collection may behave differently.
Check actual staff availability with managers. Labor hours and elapsed time are different: someone available for only part of the week cannot deliver a week’s effort in five days. Waiting for an owner’s answer also affects the schedule. Agree on review windows and leave time for corrections.
Review the result before asking owners to approve it
Assign responsibility for the whole section and plan two internal reviews by people on your team before owner handoff.
The first checks completeness and technical integrity. Account for the material expected to arrive, what was intentionally excluded and what remains unresolved. Check the files and relationships as well as the visible page body. Correct transfer problems and repeat the affected checks.
Have another team member review the quality of the actual pages: images, links, formatting and whether the section is recognizable and usable. Bring in accessibility or other specialists where their judgment is needed. The two reviews may find overlapping problems; give both purposes time in the plan.
Then give the owner a recognizable section, its approved source, known exceptions and a workable response window. Ask them to check completeness and accuracy and try the tasks their audience needs to complete. Record corrections and send the affected material through the necessary checks again.
Keep design feedback on its own review path. Someone may prefer the old layout while confirming that the information is correct. They may also like the new presentation and overlook a missing instruction. Make clear which judgment you need from them.
Record what was checked, by whom, against which source version and which version of the new site. A useful progress report distinguishes transferred, awaiting correction, internally checked and owner-reviewed work.
Plan and test the old URLs
Use the source-to-destination mapping to plan what happens when someone follows an existing link. A redirect sends a request for an old address to another location. Agree on a useful destination with the content owner and technical team, then assign implementation and testing.
Several old pages may lead to one consolidated page. A split needs its own decision: someone arriving through the old address still needs a sensible way to find the right material. Retiring content also needs an assessed URL treatment. Sending every old address to the home page is unlikely to serve those visitors well.
Ask the technical lead to choose the appropriate redirect behavior. Update your own links to the final destinations and check for unnecessary chains, loops and wrong targets. Include important campaign links and confirm what should happen to their tracking parameters under the agreed privacy conditions.
Keep the statuses separate. An agreed destination is a decision; a configured redirect is implementation; a successful check is evidence of behavior in that environment. Checks on staging need to be followed by the relevant live checks under the launch plan.
Keep later changes and exceptions visible
The existing site may continue changing while migration is underway. Agree on how owners will report edits to material already prepared or moved, who will reconcile the versions and which checks must be repeated. A final content freeze helps at launch, but you need a way to track changes before then.
Keep unresolved items in a focused list with their sources, destinations, owners and next actions. An isolated question may be held while independent work continues. A faulty rule used across a batch needs a pause while the team establishes what it affected.
Repair the confirmed errors, test revised instructions on fresh material and recheck earlier results where necessary. Preserve valid work. If an awkward content group costs more to automate than it would to handle another way, make that choice with the delivery lead.
Before expanding the next batch, confirm that the destination is ready, the approved material is available and the people doing preparation, transfer and review have time for it. Carry remaining exceptions and later live checks into launch planning. Use the trial and each completed batch to improve the plan while you still have room to respond.
Continue in Redesign Field Guide
Lesson 4.2, Prepare and Migrate Content, develops the trial, workload planning, review process and handoff in more detail, including AI-assisted transfer and inspection.
The hypothetical Gatesbridge migration worked example follows an ordinary item through its source, destination and checks while keeping a more complex exception open.
If the content decisions still need work, return to Lesson 2.1, Understand What You Have, for inventory and owner-review guidance.
These lessons and the worked example require paid guide access.